Self-build home: Occupy the home and rectify any defects
A meeting should be held to formally handover the completed site for occupation. Keys should be handed over, along with as-built drawings, certificates, warranties and so on.
A procedure should be agreed for reporting any defects.
The defects liability period (or rectification period) is a period set out in construction contracts (often 6 months) during which contractors are still bound by the terms of the contract and can be instructed to make good any defects that become apparent in the works.
The self builder should:
- Keep detailed notes about any defects that appear.
- Decide whether defects are design deficiencies or construction defects.
- Notify the responsible party and arrange access for inspection and rectification.
- At the end of the defects liability period, prepare a schedule listing defects that have not yet been rectified and agree with the contractor the date by which they will be rectified. The contractor must in any event rectify defects within a 'reasonable' time.
- Ensure that all outstanding warranties, instructions and other paperwork has been received.
- Finalise any outstanding party wall matters.
- Arrange final inspections of the works and if satisfied issue a certificate of making good defects.
- Agree the final account.
- Issue the final certificate and make the final payment.
If you have ideas for how to improve this plan, you can make changes yourself, just by clicking 'Edit this article', you can add ideas to the discussion page, you can submit a comment to us, or you can email [email protected].
Featured articles and news
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.























Comments
Thank you very much for this, much appreciated.